The Elkhart Community School Corporation contacted JPR to assist in designing and overseeing the installation of a new synthetic turf football field at Elkhart Central High School.
This project faced hurdles in obtaining State approval for Construction in a Floodway due to its proximity to the Elkhart River. However, JPR successfully secured the required permits and finalized the plan drawings promptly, allowing the contractor to finish construction before the school opened and the 2018 football season began.